Last week I was onsite in East London with a new client, reviewing a full house refurbishment including basement, loft, and complete strip out. My visit was all about understanding the site constraints ahead of Daylight designing, supplying, and installing a structural glazed roof for the project, one that will appear to float effortlessly above exposed oak joists. We’ve now produced detailed CAD drawings and are just waiting on final sign-off. The wall construction is scheduled for the next 2–3 weeks. Looking forward to seeing this one come to life here are a few site shots and drawings to give you a preview.

Posted by James allen at 2025-06-25 09:09:07 UTC